Extend pavement life and protect your parking lot investment
From preventative sealing to full parking lot repaving
Preventative maintenance saves thousands in repaving costs
Sealing costs $0.20-0.40/sq ft every 2-3 years. Repaving costs $3-7/sq ft. Regular sealing extends pavement life 2-3x, saving thousands long-term.
Protects against water penetration, freeze-thaw cycles, UV oxidation, oil/chemical deterioration, and salt damage. Sealing prevents small cracks from becoming major problems.
Sealcoating restores rich black color, covers stains and weathering, provides uniform appearance, and dramatically improves curb appeal. Fresh-looking parking lots attract customers.
Well-maintained parking lots enhance property value, show responsible ownership, reduce liability concerns, and make positive impressions on tenants, customers, and investors.
Sealing fills surface voids, provides smoother driving surface, reduces vehicle wear, improves water drainage, and creates safer parking conditions with better traction.
Most parking lots sealed in 1-2 days. Can reopen 24-48 hours after final coat. Minimal business disruption compared to repaving which takes weeks and major closures.
Get a free assessment and quote for asphalt sealing or paving
Professional application from assessment to completion
Free on-site evaluation of pavement condition. Identify damage, assess drainage, recommend sealing vs repairs vs repaving based on current state.
Power wash surface (removes all dirt/oil/debris). Fill cracks with hot rubberized filler. Repair potholes and damaged areas. Edge trimming if needed.
Apply first coat of commercial-grade sealer. Allow drying (4-8 hours). Apply second coat for maximum protection. Professional spray or squeegee application.
Allow 24-48 hours for complete curing. Coordinate line painting once fully cured. Reopen parking lot with fresh appearance and protection.
When to seal and when to repave
Transparent pricing for sealing, repairs, and paving
Example: 10,000 sq ft parking lot sealing = $2,000-4,000. Same lot repaving = $30,000-70,000. Sealing saves thousands!
Bundle & Save: Combine power washing + sealing + line painting for 10-15% discount. One project, coordinated timing, maximum value.
The right sequence for best results and longest-lasting protection
Bundle all three and save 10-15% plus coordinated scheduling!
Common questions about sealcoating and paving
Asphalt sealing (sealcoating) is applying a protective layer to asphalt pavement to shield it from water, UV rays, oils, and chemicals. Sealing extends pavement life by 2-3x, prevents cracks from forming, maintains flexibility, and restores rich black appearance. It's preventative maintenance that saves thousands versus repaving costs.
Asphalt sealing typically costs $0.20-0.40 per square foot depending on lot condition, size, and preparation needed. A 10,000 sq ft parking lot averages $2,000-4,000 for sealing. Crack filling adds $1-3 per linear foot. Repairs vary by damage extent. Bundle with power washing and line painting for 10-15% discount.
Yes, we provide asphalt sealing and paving throughout the Greater Toronto Area including Markham, Richmond Hill, Scarborough, North York, Newmarket, Vaughan, Toronto, and surrounding municipalities. Same service coverage as our cleaning and specialty services for complete facility care.
Commercial parking lots should be sealed every 2-3 years depending on traffic volume, weather exposure, and current condition. High-traffic lots may need sealing every 1-2 years. New asphalt should cure 6-12 months before first sealing. Regular sealing is much cheaper than letting pavement deteriorate and requiring costly repairs or replacement.
Late spring through early fall (May-October) when temperatures are consistently above 10°C and dry weather is forecast. Sealcoating needs 24-48 hours to cure without rain. We avoid humid, rainy periods and cold temperatures. Best results come from warm, dry conditions allowing proper curing and adhesion.
Sealing protects asphalt from water penetration (prevents freeze-thaw damage), UV ray oxidation (stops surface breakdown), petroleum products and oils (prevents chemical deterioration), salt and de-icing chemicals, and general weathering. It fills surface voids, prevents raveling, and maintains pavement flexibility preventing cracks.
Yes! Proper preparation is critical. We clean the surface thoroughly (power washing recommended), fill all cracks with hot rubberized crack filler, repair potholes and damaged areas, level uneven surfaces, and address drainage issues. Sealing over unrepaired damage doesn't fix underlying problems - proper prep ensures long-lasting results.
Timeline depends on lot size and preparation needed. Small lots (5,000-10,000 sq ft) take 4-8 hours including prep and application. Medium lots (20,000-40,000 sq ft) take 1-2 days. Large facilities may require 2-4 days. We apply 2 coats for best protection. Parking lots can reopen 24-48 hours after final coat.
Yes, we can work in phases to maintain partial parking availability. We section off areas with cones and barricades, complete one section while others remain open, then rotate to next section. This approach takes longer but minimizes business disruption. We often schedule work during off-peak hours or weekends.
Sealing is preventative maintenance coating existing asphalt ($0.20-0.40/sq ft, done every 2-3 years). Repaving is replacing damaged asphalt ($3-7/sq ft, needed when pavement is too deteriorated). Regular sealing prevents the need for expensive repaving. If asphalt has major structural damage, alligator cracking, or severe potholes, repaving may be necessary.
Yes, we provide complete asphalt services including new parking lot paving, overlay paving (adding new layer over existing), full-depth repaving for severely damaged lots, and spot repairs. We assess your pavement condition during free evaluation and recommend most cost-effective solution - repair and seal versus repave.
Absolutely! The ideal sequence is: power wash to remove all dirt/oil/debris, allow 24-48 hours drying, repair cracks and damage, apply sealcoating (2 coats), cure 24-48 hours, then apply fresh line painting. This maximizes adhesion and longevity. We offer bundled packages combining all services with coordination and discount pricing.
We use commercial-grade coal tar or asphalt emulsion sealers depending on your specific needs. Coal tar provides superior resistance to oils and chemicals (ideal for high-traffic commercial). Asphalt emulsion is more eco-friendly and works well for standard applications. We recommend best option based on your lot conditions and requirements.
Yes, Zusashi Maintenance is fully licensed and insured with $5 million liability coverage for all services including asphalt sealing, paving, and repairs. All crews are WSIB compliant, properly trained, and use professional-grade equipment. We provide certificates of insurance to all commercial clients and meet municipal requirements.
Absolutely! Current cleaning clients receive 10-15% discount on asphalt services plus priority scheduling. We offer complete packages: cleaning + power washing + line painting + asphalt sealing for maximum savings and convenience. Coordinate everything with one vendor, one invoice, one relationship. Many property managers bundle all facility services with us.
Join 200+ satisfied businesses across Markham & the GTA. Tell us about your facility and we'll send a custom proposal fast — no obligations, no pushy sales calls.
Online | Cleaning Specialist